Lean Factory Game Kit
The physical production simulation: a complete kit for 6–16 participants, four hours of hands-on Lean — flow, pull, takt time and kaizen you can literally hold in your hands.
A mini-factory on your conference table
The Factory Game Kit turns any meeting room into a production plant. Teams build real products from real materials, face real customer orders — and create real waste: piles of inventory, waiting times, defects, overproduction. In round two, the team applies what it just learned: one-piece flow, pull signals, balanced stations, 5S at the workplace.
The kit is designed for repeated use: run it in onboarding, in kaizen events, in leadership offsites or as the anchor of your internal Lean academy. One purchase, unlimited internal sessions.
- Complete kit: materials for 6–16 players, moderator guide, score sheets, order cards
- 4-hour agenda: introduction, 2–3 rounds, structured debrief and transfer
- License for unlimited internal use — no per-session fees
- Moderated on-site by us (DACH/EU) or self-run after train-the-trainer

What's inside the €3,300 kit
Game materials
All physical components for up to 16 players per table: raw materials, work-in-progress trays, tooling, quality gauges and finished-goods packaging.
Moderator package
Step-by-step moderation guide (DE/EN), presentation deck, timer cards, order cards for three difficulty levels and KPI score sheets.
Transfer toolkit
Debrief question sets, a kaizen action template and a poster set of the Lean principles experienced in the game — ready to hang in your shop floor area.

Learning goals
- Understand takt time, cycle time and line balancing by adjusting them live
- Experience the cost of push production vs. the stability of pull
- See how 5S and standard work reduce search time and defects
- Practice kaizen: plan, implement and measure improvements between rounds
Works particularly well for: production teams, logistics, quality, maintenance, industrial engineering and mixed cross-functional groups.
What teams say after playing
“The Factory Game Kit is now a permanent part of our onboarding for production planners. New hires grasp takt time and bottlenecks within an hour.”
“As a Lean coach I have tried many simulations. LeanActivity is the only one where even sceptical shop-floor veterans joined the second round voluntarily.”
“The Office Game exposed waste in our invoice approval process that had been invisible for years. We cut lead time by 40 % within one quarter.”
Bring the Factory Game to your plant
Kit purchase, moderated on-site workshop, or both — we quote within one working day.
Contact us See pricing