5S
Workplace organisation method in five steps: Sort, Set in order, Shine, Standardise, Sustain. Origin of most Lean housekeeping standards. See our 5S guide and audit template.
Andon
Visual or acoustic signal with which a worker calls for help or stops the line when a problem occurs. Part of the Jidoka principle.
Continuous Improvement (KVP / Kaizen)
The ongoing, incremental improvement of processes by the people doing the work. In German companies often called KVP (Kontinuierlicher Verbesserungsprozess).
Cycle Time
The time between completion of two consecutive units at a process step. Compare with takt time to detect over- or under-capacity.
Gemba
Japanese for “the real place” — where value is created. A gemba walk means going to the shop floor to observe instead of deciding from the desk.
Hansei
Structured self-reflection after a project or event, focused on learning rather than blaming.
Heijunka
Levelling of production volume and mix to smooth the load on processes and reduce batching effects.
Jidoka
“Autonomation” — building quality into the process so that machines or operators stop automatically when a problem occurs. One of the two pillars of the Toyota Production System.
Kaizen
Japanese for “change for the better”: the philosophy of continuous, small-step improvement involving everyone. A kaizen event is its focused, time-boxed form.
Kaizen Event (Kaikaku Workshop)
A 2–5 day workshop in which a cross-functional team radically improves one specific process. See our kaizen event guide.
Kanban
Pull-based control method using visual signals (cards, bins) to trigger replenishment. Limits work in progress and makes flow visible.
Lead Time
Total time a product or request spends in the system — including waiting. Often dramatically longer than value-adding time.
Lean Management
Management approach derived from the Toyota Production System, focused on maximising customer value while eliminating waste (muda).
Muda
Japanese for “waste”: any activity that consumes resources but creates no customer value. The seven classic wastes: overproduction, waiting, transport, over-processing, inventory, motion, defects.
Mura / Muri
Mura is unevenness in process load, Muri is overburden of people or equipment. Together with Muda the three enemies of Lean.
OEE (Overall Equipment Effectiveness)
OEE = Availability × Performance × Quality. The standard metric for equipment productivity. Try our OEE calculator.
One-Piece Flow
Producing and moving one unit at a time through the process, without batches — the ideal state of flow.
Poka-Yoke
Error-proofing devices or designs that make defects impossible or immediately detectable.
Pull System
Production control in which downstream demand triggers upstream work — the opposite of push scheduling.
SMED (Single-Minute Exchange of Die)
Method to reduce changeover times to under ten minutes, enabling smaller economic batch sizes.
Standard Work
The current best-known way to perform a task, documented and followed — the baseline for further improvement.
Takt Time
Available production time divided by customer demand: the pace at which the process must produce to match demand. Use our takt time calculator.
Toyota Production System (TPS)
The production philosophy of Toyota — built on the pillars Jidoka and Just-in-Time — and the origin of Lean Management.
Value Stream
All steps (value-adding and non-value-adding) a product or service passes from order to delivery.
Value Stream Mapping (VSM)
Visualisation of material and information flow of a value stream, with KPIs — the standard tool to plan Lean improvements.
WIP (Work in Progress)
All items currently in the system between start and completion. High WIP hides problems and inflates lead time.