Kaizen Event

How to plan and run a kaizen event: 5-day agenda, team composition, baseline measurement and common mistakes.

What is a kaizen event?

A kaizen event (also kaizen blitz or improvement workshop) is a 2–5 day, time-boxed workshop in which a cross-functional team radically improves one specific process — with implementation during the event, not on paper.

When it is the right format

  • The problem area is known and physically accessible (line, office process, warehouse zone)
  • Management has committed to implement what the team decides
  • A measurable baseline exists or can be created within a day

The 5-day agenda

DayFocusOutput
1Training & baseline: Lean basics (often via a game round), current-state walk, data collectionCurrent-state map + baseline KPIs
2Root cause & vision: waste analysis, target state designTarget-state sketch, improvement backlog
3Implementation part 1: layout, flow, 5S, standardsPhysical changes live
4Implementation part 2 + test run: run the new process, measure, adjustMeasured new KPIs
5Standardise & report: standards, open actions with owners, presentation to managementEvent report, follow-up plan

Team composition

6–10 people: the process owners (those who do the work), one moderator, one sponsor with decision power, plus support functions (maintenance, IT, planning) on call. Keep observers out — kaizen is participation.

Common mistakes

  • Scope too broad ("improve the whole plant") → one value stream, one metric family
  • No baseline → no proof, no momentum
  • Improvements postponed to "after the event" → the event loses credibility; implement ≥70 % live
  • No follow-up owner → 30/60/90-day review is mandatory

Free resources

Download our kaizen event plan template (CSV) from the template library, and read Running Your First Kaizen Event on the blog.

Kick-off tip: open day 1 with a 90-minute Factory Game round. Teams enter the real problem with a shared Lean vocabulary — measurably better discussions from hour one.