5S Template

Free 5S audit template and a 30-day rollout plan: red-tag campaign, visual standards, audits and sustaining.

The five steps

5S organises the workplace so that everything has a place, everything is in place, and deviations are visible in seconds: Sort, Set in order, Shine, Standardise, Sustain (Japanese: Seiri, Seiton, Seiso, Seiketsu, Shitsuke).

StepCore questionTypical actions
1 — SortWhat does not belong here?Red-tag campaign, remove unneeded items, define storage rules
2 — Set in orderWhere does everything belong?Shadow boards, floor markings, labelled locations, ergonomic placement
3 — ShineIs inspection built into cleaning?Cleaning = inspection routine, leak and damage checks
4 — StandardiseHow do we keep it?Visual standards, one-page checklists, responsibilities per zone
5 — SustainWho audits, who coaches?Regular audits, results on the team board, recognition

Free 5S audit template

Download the 5S audit checklist (CSV): 30 checkpoints across the five S, scoring 0–4, with a column for photo evidence and corrective actions. Opens in Excel, LibreOffice or Google Sheets — more templates in the template library.

30-day rollout plan

  1. Week 1 — prepare: pick one pilot zone, photograph the status quo, train the team (30 min), print red tags.
  2. Week 2 — Sort & Set in order: red-tag day; decide keep/relocate/scrap within 48 h; create placements and markings.
  3. Week 3 — Shine & Standardise: define cleaning-as-inspection routines; write the one-page standard with photos.
  4. Week 4 — Sustain: first audits with the template, results on the board, agree audit cadence (weekly at first, monthly later).

Detailed version on our blog: 5S in Practice — A 30-Day Rollout Plan.

Why 5S is more than cleaning

5S is the first experience of self-efficacy in a Lean journey: a team changes its own environment visibly within days. That success carries the harder topics — standard work, pull, kaizen. A 5S day also works very well as the practical part after a Factory Game session.

Sustain rule: audit results below target trigger a 15-minute team countermeasure discussion — not a blame conversation. 5S lives or dies in step 5.