Lean Training
How to structure effective Lean training: curricula, formats for production and office, and train-the-trainer.
Beyond the classic seminar
Lean training means enabling teams to recognise waste, understand flow and improve processes themselves. The best-known format — the two-day classroom seminar — is also the least effective when the goal is behavioural change.
Adults learn process thinking by doing it. That is why modern Lean training combines short theory inputs with immediate application: in simulations, on the real gemba, or in a mix of both.
A proven curriculum structure
- Awareness (2 h): a Lean game as eye-opener — the team experiences waste and flow firsthand. Formats: Online Game, Factory Game, Office Game.
- Method basics (1–2 days): 5S, standard work, value stream mapping, kanban — taught on the team's own processes, not on paper examples.
- Application (2–5 days): a real kaizen event with measurement before/after.
- Routine (ongoing): gemba walks with our checklist, monthly improvement reviews, internal standards.
Production vs. office
Production training anchors on takt time, line balancing, SMED and pull — the takt time calculator and OEE calculator are the daily metrics. Office training anchors on lead time, handovers and information quality; the Office Game simulates exactly these flows.
Train-the-trainer
For companies that want to run trainings repeatedly, certification of internal moderators pays off after three to four sessions. LeanActivity offers a two-day certification including game kits and first-year license.
Planning checklist
- Define target group and learning goal per group (awareness vs. method vs. routine)
- Mix formats: one game opener per department, method modules cross-departmental
- Measure before/after: lead time, WIP, defects — numbers make the training ROI visible
- Anchor transfer: every training ends with 2–3 actions, owner and date
Next step: tell us your headcount and goals — we propose a curriculum and dates: contact us.