Manufacturing Training

Shop-floor manufacturing training: production simulations, takt time, OEE, 5S and kaizen in one field-tested program.

What good manufacturing training achieves

Manufacturing training should shorten the distance between "knowing" and "doing" on the shop floor: operators who recognise overproduction, planners who balance to takt, and teams that run improvements without waiting for consultants.

Core topics

  • Flow & takt time: line balancing, one-piece flow, bottleneck management — experience it in the Factory Game, calculate it with the takt time calculator.
  • Pull & kanban: replenishment logic, supermarket sizing, FIFO lanes.
  • 5S & standard work: workplace organisation that survives audits — 5S guide & template.
  • Equipment effectiveness: the six big losses and OEE — OEE calculator and tracking sheet.
  • Improvement routine: gemba walks (checklist), kaizen events, suggestion systems that work.

A field-tested program

ModuleTarget groupFormatDuration
Lean basics & gameAll production staffFactory Game on-site4 h
5S workplaceTeams + supervisorsWorkshop on real workplaces1 day
Standard work & balancingPlanners, IEWorkshop with own data1 day
Kaizen eventMixed teamReal process improvement3–5 days
Train-the-trainerIn-house moderatorsCertification2 days

Rollout tips

  1. Start with volunteers from one line — success stories beat mandates.
  2. Train supervisors first; they decide whether transfer survives.
  3. Measure OEE or lead time of one pilot line before and after.
  4. Make improvement visible: boards at the line, 10-minute daily reviews.

Combine: Factory Game as opener + kaizen event on the bottleneck line is the fastest way to a visible result within one quarter.