Manufacturing Training
Shop-floor manufacturing training: production simulations, takt time, OEE, 5S and kaizen in one field-tested program.
What good manufacturing training achieves
Manufacturing training should shorten the distance between "knowing" and "doing" on the shop floor: operators who recognise overproduction, planners who balance to takt, and teams that run improvements without waiting for consultants.
Core topics
- Flow & takt time: line balancing, one-piece flow, bottleneck management — experience it in the Factory Game, calculate it with the takt time calculator.
- Pull & kanban: replenishment logic, supermarket sizing, FIFO lanes.
- 5S & standard work: workplace organisation that survives audits — 5S guide & template.
- Equipment effectiveness: the six big losses and OEE — OEE calculator and tracking sheet.
- Improvement routine: gemba walks (checklist), kaizen events, suggestion systems that work.
A field-tested program
| Module | Target group | Format | Duration |
|---|---|---|---|
| Lean basics & game | All production staff | Factory Game on-site | 4 h |
| 5S workplace | Teams + supervisors | Workshop on real workplaces | 1 day |
| Standard work & balancing | Planners, IE | Workshop with own data | 1 day |
| Kaizen event | Mixed team | Real process improvement | 3–5 days |
| Train-the-trainer | In-house moderators | Certification | 2 days |
Rollout tips
- Start with volunteers from one line — success stories beat mandates.
- Train supervisors first; they decide whether transfer survives.
- Measure OEE or lead time of one pilot line before and after.
- Make improvement visible: boards at the line, 10-minute daily reviews.
Combine: Factory Game as opener + kaizen event on the bottleneck line is the fastest way to a visible result within one quarter.